M-101 · DLC-15

Chemical Flushing
Chemical cleaning and flushing of new pipework before a cooling loop is filled and handed over.
- Family
- Direct Liquid Cooling & Secondary Loop Support
- Make
- Engreen
- Lead time
- On request
- Projects
- On request
How it works
New pipework carries mill scale, oil, welding residue and debris. A portable circulation rig pumps cleaning chemicals through the system, then flushes to drain until water-quality results meet the specification. Clean pipework is essential before connecting CDUs and cold plates.
Role in the system
- 1.Removes construction debris and oil
- 2.Passivation before the final fill
- 3.Water-quality records for handover
Supplied to
Project references for this item are shared on request with your quotation.
Include in your quotation request
- System volume and pipe material
- Pipe sizes and approximate length
- Required cleanliness / acceptance criteria
- Site schedule
- Quantity
This checklist is filled into the quotation form for you. Leave blank what you don't know yet.
Open the pre-filled quotation form


